Hi,
I'm doing the Cathe Jan 2010 STS rotation. I've downloaded it to my calendar but I want to to extend mesocycle 2 and repeat each week. Is there a way to add this to my calendar? Hope this makes sense. So, for example, after week 6, instead of going to week 7, I would like to add week 6 in place of week 7 and move week 7 down to week 8, and week 7 in place of week 8 and so on.
Thanks,
KC
I'm doing the Cathe Jan 2010 STS rotation. I've downloaded it to my calendar but I want to to extend mesocycle 2 and repeat each week. Is there a way to add this to my calendar? Hope this makes sense. So, for example, after week 6, instead of going to week 7, I would like to add week 6 in place of week 7 and move week 7 down to week 8, and week 7 in place of week 8 and so on.
Thanks,
KC